2019.07.09

Opening of the summit crater loop (Ohachi-meguri) trail

An onsite inspection conducted on July 2nd confirmed a considerable amount of snow remains on the slope across the traverse path below the Kengamine peak. For that reason, the summit crater trail shall be opened only partially on July 10 (along with other trails).

The whole summit crater (Ohachi-meguri) trail is now open (as of July 10th).

Traverse path near the Kengamine peak (Taken July 9). Please walk below the snow line.